Determination of NEPA Adequacy Streamlining Act
Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.
Determination of NEPA Adequacy Streamlining Act
This bill requires the Department of Agriculture and the Department of the Interior to use a previously completed environmental assessment or environmental impact statement required under the National Environmental Policy Act of 1969 for a proposed transmission, pipeline, or renewable energy facility project if the proposed project is substantially the same as one addressed in the previous assessment or statement.
Referred to the Subcommittee on Conservation and Forestry.
- Introduced in House Formatted Text PDF Formatted XML
Cite this page
U.S. Congress. (2026). H.R. 9025: Determination of NEPA Adequacy Streamlining Act. 117th Congress. Open America. https://openamerica.io/bill/117-HR-9025/
"H.R. 9025: Determination of NEPA Adequacy Streamlining Act." 117th Congress, 2026, Open America, https://openamerica.io/bill/117-HR-9025/.
H.R. 9025, 117th Cong. (2026), https://openamerica.io/bill/117-HR-9025/.
[H.R. 9025: Determination of NEPA Adequacy Streamlining Act](https://openamerica.io/bill/117-HR-9025/)