Skip to main content
HR 6500 97th Congress House

Cogeneration and Small Power Production Program Clarification Act of 1982

Official title: A bill to amend the Public Utility Regulatory Policies Act of 1978.

Introduced: May 26, 1982 See on congress.gov
Energy Cogeneration of electric power and heatElectric powerElectric utilitiesPublic utilitiesPublic utility rates
This bill died when the 97th Congress ended
It never became law before the 97th Congress (1981–1982) adjourned, and bills don't carry over to the next Congress. It would have to be reintroduced. You can still save it for reference, but it won't receive updates.
 Everywhere this bill has been 4 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Jun 15, 1982
Subcommittee Hearings Held.
Jun 2, 1982
Referred to Subcommittee on Energy Conservation and Power.
May 26, 1982
Referred to House Committee on Energy and Commerce.
May 26, 1982
Introduced in House
 Ask about this bill AI · grounded in the bill text

Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.

AI answers can be imperfect; always confirm against the full bill text.

 Latest action June 15, 1982

Subcommittee Hearings Held.

 Plain-English summary Congressional Research Service

Cogeneration and Small Power Production Program Clarification Act of 1982 - Amends the Public Utility Regulatory Policies Act of 1978 to require that the rates for electric energy purchased by an electric utility from a qualifying cogeneration facility or qualifying small power production facility be established at the incremental cost to the utility of alternative electric energy, unless the State regulatory authority or a nonregulated electric utility determines that another rate: (1) would encourage cogeneration and small power production; (2) would not discriminate against qualifying cogenerators and small power producers; and (3) would be consistent with the interests of consumers and with the public interest.

Provides that rules prescribed by the Federal Power Commission must require electric utilities to offer to interconnect with qualifying cogeneration and small power production facilities in addition to requiring that electric utilities offer to sell electric energy to, and buy electric energy from, such facilities. Requires that such facilities pay any reasonable interconnection costs incurred by the utilities making such an offer. Authorizes the State regulatory authority to prescribe the terms for an interconnection if the electric utility and the qualifying cogeneration or small power production facility involved cannot resolve disputes concerning their interconnection.

 Committees of jurisdiction 2
Cite this page click to expand
APA
U.S. Congress. (2026). H.R. 6500: Cogeneration and Small Power Production Program Clarification Act of 1982. 97th Congress. Open America. https://openamerica.io/bill/97-HR-6500/
MLA
"H.R. 6500: Cogeneration and Small Power Production Program Clarification Act of 1982." 97th Congress, 2026, Open America, https://openamerica.io/bill/97-HR-6500/.
Bluebook (legal)
H.R. 6500, 97th Cong. (2026), https://openamerica.io/bill/97-HR-6500/.
Markdown link
[H.R. 6500: Cogeneration and Small Power Production Program Clarification Act of 1982](https://openamerica.io/bill/97-HR-6500/)
Report a problem