State Planning for Reliability and Affordability Act
Official title: To amend the Public Utility Regulatory Policies Act of 1978 to add a standard related to State consideration of reliable generation, and for other purposes.
| Date | Chamber | What was voted on | Result | Yes–No | |
|---|---|---|---|---|---|
| Dec 11, 2025 | House · vote #323 | On Passage | Passed | 218–207 | See who voted → |
Amendments propose changes to this bill. Members vote on amendments separately before the final bill vote. An agreed amendment becomes part of the bill; a failed amendment does not.
1 agreed to
| Amendment | Sponsor | Status |
|---|---|---|
| HAMDT 117 | Moore, Riley M. | Agreed to |
Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.
Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
State Planning for Reliability and Affordability Act
This bill requires certain state authorities that regulate electric utilities to consider the establishment of measures regarding the reliable availability of electricity over specified time periods. These requirements would apply to electric utilities that use integrated resource plans—plans that project future electricity use to ensure resource adequacy, as opposed to utilities that rely on capacity markets, which use price trends for resource planning.
Specifically, the state authorities must consider requiring the integrated resource plans of electric utilities to include measures to ensure the reliable availability of electric energy over a 10-year period to maintain the operation of reliable generation facilities or the procurement of electric energy from reliable generation facilities.
The bill defines reliable generation facilities as facilities that
- enable the generation of electric energy on a continuous basis over a period of not fewer than 30 days;
- have adequate fuel or a continuously available energy source on-site to enable the continuous generation of electric energy for at least 30 days, or have contractual obligations that achieve the same;
- have operational characteristics to enable the generation of electric energy during emergency and severe weather conditions; and
- provide services such as frequency support and voltage support.
- Engrossed in House Formatted Text PDF Formatted XML
- Introduced in House Formatted Text PDF Formatted XML
- Referred in Senate Formatted Text PDF Formatted XML
- Reported in House Formatted Text PDF Formatted XML
- NATIONAL GRID USA
- EDISON ELECTRIC INSTITUTE
- NATIONAL MINING ASSOCIATION
- PUGET SOUND ENERGY
- XCEL ENERGY, INC
- PPL CORPORATION
Bodies those filers lobbied
- HOUSE OF REPRESENTATIVES
- SENATE
- Energy, Dept of
- Treasury, Dept of
- Federal Energy Regulatory Commission (FERC)
- Environmental Protection Agency (EPA)
- Executive Office of the President (EOP)
- Interior, Dept of (DOI)
Cite this page
U.S. Congress. (2026). H.R. 3628: State Planning for Reliability and Affordability Act. 119th Congress. Open America. https://openamerica.io/bill/119-HR-3628/
"H.R. 3628: State Planning for Reliability and Affordability Act." 119th Congress, 2026, Open America, https://openamerica.io/bill/119-HR-3628/.
H.R. 3628, 119th Cong. (2026), https://openamerica.io/bill/119-HR-3628/.
[H.R. 3628: State Planning for Reliability and Affordability Act](https://openamerica.io/bill/119-HR-3628/)