Skip to main content
HR 2854 117th Congress House

Utility Resilience and Reliability Act

Official title: To amend the Federal Power Act to require the Electric Reliability Organization to propose a reliability standard that addresses the resilience of the bulk-power system, and for other purposes.

Introduced: April 26, 2021 Introduced by: Thompson, Mike Democratic · California See on congress.gov
Energy Atmospheric science and weatherCongressional oversightElectric power generation and transmissionGovernment information and archivesPublic utilities and utility rates
This bill died when the 117th Congress ended
It never became law before the 117th Congress (2021–2022) adjourned, and bills don't carry over to the next Congress. It would have to be reintroduced. You can still save it for reference, but it won't receive updates.
 Everywhere this bill has been 3 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Apr 27, 2021
Referred to the Subcommittee on Energy.
Apr 26, 2021
Introduced in House
Apr 26, 2021
Referred to the House Committee on Energy and Commerce.
 Ask about this bill AI · grounded in the bill text

Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.

AI answers can be imperfect; always confirm against the full bill text.

 Latest action April 27, 2021

Referred to the Subcommittee on Energy.

 Plain-English summary Congressional Research Service

Utility Resilience and Reliability Act

This bill addresses the reliability of electric energy provided by the bulk-power system, which includes facilities and control systems necessary for operating an interconnected electric energy transmission network.

Specifically, the Electric Reliability Organization must file with the Federal Energy Regulatory Commission a proposed reliability standard that addresses the resilience of the bulk-power system. For example, the standard must address the system's ability to withstand and rapidly recover from disruptions, such as extreme weather conditions. The standard must take into account regional differences.

In addition, the Department of Energy (DOE) must establish a program to provide information and recommendations to states and electric utilities on how to improve the resilience of electric grids. DOE must also post on its website a report that provides recommendations on how to minimize the need for, effects of, and duration of planned electric power outages that are due to extreme weather conditions.

 Bill text 1 version

Source documents hosted by congress.gov.

 Committees of jurisdiction 2
Cite this page click to expand
APA
U.S. Congress. (2026). H.R. 2854: Utility Resilience and Reliability Act. 117th Congress. Open America. https://openamerica.io/bill/117-HR-2854/
MLA
"H.R. 2854: Utility Resilience and Reliability Act." 117th Congress, 2026, Open America, https://openamerica.io/bill/117-HR-2854/.
Bluebook (legal)
H.R. 2854, 117th Cong. (2026), https://openamerica.io/bill/117-HR-2854/.
Markdown link
[H.R. 2854: Utility Resilience and Reliability Act](https://openamerica.io/bill/117-HR-2854/)
Report a problem