J. Bennett Johnston Waterway Hydropower Extension Act of 2017
| Date | Chamber | What was voted on | Result | Yes–No | |
|---|---|---|---|---|---|
| Jun 12, 2017 | House · vote #301 | On Motion to Suspend the Rules and Pass, as Amended | Passed | 402–1 | See who voted → |
Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.
J. Bennett Johnston Waterway Hydropower Extension Act of 2017
(Sec. 2) This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana.
The licensee is not required to pay an annual charge for administrative expenses until construction commences.
FERC may reinstate the construction license if it is expired.
Committee on Energy and Natural Resources Senate Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 115-505.
- Engrossed in House Formatted Text PDF Formatted XML
- Introduced in House Formatted Text PDF Formatted XML
- Referred in Senate Formatted Text PDF Formatted XML
- Reported in House Formatted Text PDF Formatted XML
Cite this page
U.S. Congress. (2026). H.R. 2457: J. Bennett Johnston Waterway Hydropower Extension Act of 2017. 115th Congress. Open America. https://openamerica.io/bill/115-HR-2457/
"H.R. 2457: J. Bennett Johnston Waterway Hydropower Extension Act of 2017." 115th Congress, 2026, Open America, https://openamerica.io/bill/115-HR-2457/.
H.R. 2457, 115th Cong. (2026), https://openamerica.io/bill/115-HR-2457/.
[H.R. 2457: J. Bennett Johnston Waterway Hydropower Extension Act of 2017](https://openamerica.io/bill/115-HR-2457/)