HR 7023
110th Congress
House
To redesignate the third powerhouse facility administered by the Bureau of Reclamation and located at Grand Coulee Dam in Grand Coulee, Washington, as the "John W. Keys, III Powerplant", and for…
Official title: To redesignate the third powerhouse facility administered by the Bureau of Reclamation and located at Grand Coulee Dam in Grand Coulee, Washington, as the "Joh… Show full official titleShow less
Official title: To redesignate the third powerhouse facility administered by the Bureau of Reclamation and located at Grand Coulee Dam in Grand Coulee, Washington, as the "John W. Keys, III Powerplant", and for other purposes.
Everywhere this bill has been
3 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Sep 29, 2008
Referred to the Subcommittee on Water and Power.
Sep 23, 2008
Referred to the House Committee on Natural Resources.
Sep 23, 2008
Introduced in House
Ask about this bill
Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.
Latest action
Referred to the Subcommittee on Water and Power.
Plain-English summary
Designates the third powerhouse facility administered by the Bureau of Reclamation and located at Grand Coulee Dam in Grand Coulee, Washington, as the "John W. Keys, III Powerplant."
Bill text
1 version
- Introduced in House Formatted Text PDF Formatted XML
Committees of jurisdiction
2
Cosponsors
1
Cite this page
U.S. Congress. (2026). H.R. 7023: To redesignate the third powerhouse facility administered by the Bureau of Reclamation and located at Grand Coulee Dam in Grand Coulee, Washington, as the "John W. Keys, III Powerplant", and for other purposes.. 110th Congress. Open America. https://openamerica.io/bill/110-HR-7023/
"H.R. 7023: To redesignate the third powerhouse facility administered by the Bureau of Reclamation and located at Grand Coulee Dam in Grand Coulee, Washington, as the "John W. Keys, III Powerplant", and for other purposes.." 110th Congress, 2026, Open America, https://openamerica.io/bill/110-HR-7023/.
H.R. 7023, 110th Cong. (2026), https://openamerica.io/bill/110-HR-7023/.
[H.R. 7023: To redesignate the third powerhouse facility administered by the Bureau of Reclamation and located at Grand Coulee Dam in Grand Coulee, Washington, as the "John W. Keys, III Powerplant", and for other purposes.](https://openamerica.io/bill/110-HR-7023/)