HR 3509 108th Congress House Energy Administrative procedure Alternative energy sources Biomass energy Business records Commerce Contracts Department of Energy Electric power distribution Electric power production Electric power transmission Electric utilities Electric utility rates Energy conservation Federal Energy Regulatory Commission Fines (Penalties) Fuel cells Government Operations and Politics Government paperwork Housing and Community Development

Home Energy Generation Act

Introduced: November 18, 2003 See on congress.gov
 Everywhere this bill has been 3 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Dec 4, 2003
Referred to the Subcommittee on Energy and Air Quality.
Nov 18, 2003
Referred to the House Committee on Energy and Commerce.
Nov 18, 2003
Introduced in House
 Plain-English summary Congressional Research Service

Home Energy Generation Act - Amends the Public Utility Regulatory Policies Act of 1978 to require that: (1) each retail electric supplier make available an electric energy meter capable of net metering to certain retail customers that have installed an energy generation unit intended for net metering; and (2) rates, charges, and contract terms for electric energy sales to customer-generators be the same as those that would be applicable if the customer-generator did not own or operate a qualified generation unit and use a net metering system.

Prescribes the manner in which such retail electric suppliers shall calculate the net energy measurement and billing for a customer using a net metering system.

Subjects qualified generation units and net metering systems to specified safety, performance, and reliability standards. Authorizes the Federal Energy Regulatory Commission (FERC) to: (1) adopt additional control and testing requirements for customer-generators necessary to protect public safety and system reliability; and (2) prohibit additional charges by electric suppliers and local distribution systems for equipment or services for safety or performance additional to those necessary to meet such standards.

Sets a deadline for FERC to promulgate: (1) model standards for the physical connection between local distribution systems and qualified generation units and other specified electric generation units; and (2) regulations ensuring simplified contracts will be used for the interconnection of electric energy by electric energy transmission or distribution systems and generating facilities with a power production capacity of 250 kilowatts or less.

What's happening now December 4, 2003

Referred to the Subcommittee on Energy and Air Quality.

 Committees of jurisdiction 2