Skip to main content
S 2861 97th Congress Senate Water Resources Development Dams Illinois Missouri Rivers Water and Water Resources Development

A bill to authorize the construction of a lock on the Mississippi River in the vicinity of Alton, Illinois and Missouri, and to authorize appropriations to carry out certain programs for the Upper…

Show full title

A bill to authorize the construction of a lock on the Mississippi River in the vicinity of Alton, Illinois and Missouri, and to authorize appropriations to carry out certain programs for the Upper Mississippi River System, and for other purposes.

Introduced: August 19, 1982 See on congress.gov
This bill died when the 97th Congress ended
It never became law before the 97th Congress (1981–1982) adjourned, and bills don't carry over to the next Congress. It would have to be reintroduced. You can still save it for reference, but it won't receive updates.
 Everywhere this bill has been 2 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Aug 19, 1982
Read twice and referred to the Committee on Environment and Public Works.
Aug 19, 1982
Introduced in Senate
 Ask about this bill AI · grounded in the bill text

Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.

AI answers can be imperfect; always confirm against the full bill text.

 Plain-English summary Congressional Research Service

Grants congressional approval of the Comprehensive Master Plan for the Management of the Upper Mississippi River System as a guide for future water policy on such System.

Authorizes the Secretary of the Army, acting through the Chief of Engineers, to provide for the engineering, design, and construction, of a second lock at locks and dam 26, Mississippi River, Alton, Illinois and Missouri. Authorizes appropriations.

Authorizes the Secretary of the Interior to undertake with respect to the Upper Mississippi River System: (1) a habitat rehabilitation and enhancement program; (2) the implementation of a long-term resource monitoring program; (3) the implementation of a computerized inventory and analysis system for data storage and retrieval; and (4) the implementation of a program of recreational projects. Authorizes appropriations.

Directs the Secretary of the Interior and the Secretary of the Army, acting through the Chief of Engineers, to: (1) review the Master Plan; (2) assign priorities; and (3) develop and submit to Congress a proposal for further implementation.

Declares that such Master Plan has reasonably complied with the provisions of the National Environmental Policy Act of 1969.

What's happening now August 19, 1982

Read twice and referred to the Committee on Environment and Public Works.

 Committees of jurisdiction 1
Cite this page click to expand
APA
U.S. Congress. (2026). S. 2861: A bill to authorize the construction of a lock on the Mississippi River in the vicinity of Alton, Illinois and Missouri, and to authorize appropriations to carry out certain programs for the Upper Mississippi River System, and for other purposes.. 97th Congress. Open America. https://openamerica.io/bill/97-S-2861/
MLA
"S. 2861: A bill to authorize the construction of a lock on the Mississippi River in the vicinity of Alton, Illinois and Missouri, and to authorize appropriations to carry out certain programs for the Upper Mississippi River System, and for other purposes.." 97th Congress, 2026, Open America, https://openamerica.io/bill/97-S-2861/.
Bluebook (legal)
S. 2861, 97th Cong. (2026), https://openamerica.io/bill/97-S-2861/.
Markdown link
[S. 2861: A bill to authorize the construction of a lock on the Mississippi River in the vicinity of Alton, Illinois and Missouri, and to authorize appropriations to carry out certain programs for the Upper Mississippi River System, and for other purposes.](https://openamerica.io/bill/97-S-2861/)
Report a problem