To redesignate the facility of the Bureau of Reclamation located at Highway-155, Coulee Dam, WA 99116, as the "Nathaniel 'Nat' Washington Power Plant".
Everywhere this bill has been
5 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Jun 25, 2020
Subcommittee Hearings Held.
Aug 8, 2019
Referred to the Subcommittee on Water, Oceans, and Wildlife.
Jul 24, 2019
Referred to the House Committee on Natural Resources.
Jul 24, 2019
Sponsor introductory remarks on measure. (CR E980-981)
Jul 24, 2019
Introduced in House
Ask about this bill
Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.
Plain-English summary
This bill designates the Bureau of Reclamation's facility in Coulee Dam, Washington, known as the Third Power Plant, as the Nathaniel "Nat" Washington Power Plant.
What's happening now
Subcommittee Hearings Held.
Bill text
1 version
- Introduced in House Formatted Text PDF Formatted XML
Committees of jurisdiction
2
Cite this page
U.S. Congress. (2026). H.R. 3937: To redesignate the facility of the Bureau of Reclamation located at Highway-155, Coulee Dam, WA 99116, as the "Nathaniel 'Nat' Washington Power Plant".. 116th Congress. Open America. https://openamerica.io/bill/116-HR-3937/
"H.R. 3937: To redesignate the facility of the Bureau of Reclamation located at Highway-155, Coulee Dam, WA 99116, as the "Nathaniel 'Nat' Washington Power Plant".." 116th Congress, 2026, Open America, https://openamerica.io/bill/116-HR-3937/.
H.R. 3937, 116th Cong. (2026), https://openamerica.io/bill/116-HR-3937/.
[H.R. 3937: To redesignate the facility of the Bureau of Reclamation located at Highway-155, Coulee Dam, WA 99116, as the "Nathaniel 'Nat' Washington Power Plant".](https://openamerica.io/bill/116-HR-3937/)