Regulatory Certainty Act of 2018
Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.
Regulatory Certainty Act of 2018
This bill amends the Federal Water Pollution Control Act (commonly known as the Clean Water Act) to specify that the Environmental Protection Agency (EPA) must determine, in consultation with the U.S. Army Corps of Engineers, that a discharge of dredged or fill materials into a disposal area will have certain unacceptable adverse effects before the EPA prohibits the specification, or restricts the use, of an area as a disposal site.
The period during which the EPA may make such a prohibition is limited to the period that: (1) begins on the date that the Corps of Engineers provides notice to the EPA that the Corps of Engineers has completed all procedures for processing an application for a permit for dredged or fill material and is ready to determine whether the permit should be issued, and (2) ends on the date that the Corps of Engineers issues the permit. The Corps of Engineers must ensure that the period consists of at least 30 consecutive days.
The Corps of Engineers may issue a permit for dredged or fill material only after the Corps of Engineers provides notice to the EPA.
Read twice and referred to the Committee on Environment and Public Works.
- Introduced in Senate Formatted Text PDF Formatted XML
Cite this page
U.S. Congress. (2026). S. 3009: Regulatory Certainty Act of 2018. 115th Congress. Open America. https://openamerica.io/bill/115-S-3009/
"S. 3009: Regulatory Certainty Act of 2018." 115th Congress, 2026, Open America, https://openamerica.io/bill/115-S-3009/.
S. 3009, 115th Cong. (2026), https://openamerica.io/bill/115-S-3009/.
[S. 3009: Regulatory Certainty Act of 2018](https://openamerica.io/bill/115-S-3009/)