Skip to main content
S 2563 115th Congress Senate Water Resources Development Alaska Natives and Hawaiians Congressional oversight Department of the Interior Executive agency funding and structure Floods and storm protection Government buildings, facilities, and property Hydrology and hydrography Indian lands and resources rights State and local government operations Water resources funding Water storage Water use and supply Watersheds

Water Supply Infrastructure and Drought Resilience Act of 2018

Introduced: March 15, 2018 See on congress.gov
This bill died when the 115th Congress ended
It never became law before the 115th Congress (2017–2018) adjourned, and bills don't carry over to the next Congress. It would have to be reintroduced. You can still save it for reference, but it won't receive updates.
 Everywhere this bill has been 3 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Mar 22, 2018
Committee on Energy and Natural Resources. Hearings held. Hearings printed: S.Hrg. 115-511.
Mar 15, 2018
Read twice and referred to the Committee on Energy and Natural Resources.
Mar 15, 2018
Introduced in Senate
 Ask about this bill AI · grounded in the bill text

Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.

AI answers can be imperfect; always confirm against the full bill text.

 Plain-English summary Congressional Research Service

Water Supply Infrastructure and Drought Resilience Act of 2018

This bill establishes a pilot project to adjust flood control rule curves at Bureau of Reclamation facilities.

The bill amends the Omnibus Public Land Management Act of 2009 to increase access to Reclamation's WaterSMART program by including within the definition of "eligible applicant" any state, regional, or local authority the members of which include one or more organizations with water or power delivery authority.

The bill provides Reclamation with increased flexibility to recharge aquifers.

The conveyance of water through a project facility that crosses Bureau of Land Management land for the purpose of aquifer recharge shall not require a new or additional permit or authorization if: (1) the existing project facility has a valid agreement that allows conveyance of water for a purpose other than aquifer recharge, (2) that conveyance does not result in a substantial change to the operation of the project facility, and (3) the entity operating the facility consents to such conveyance.

In developing any rule, policy, directive, management plan, or similar federal action relating to the issuance, renewal, amendment, or extension of any permit, right-of-way, or other land use or occupancy agreement, Reclamation shall: (1) recognize the longstanding authority of the states relating to evaluating, protecting, allocating, regulating, permitting, and adjudicating water use; and (2) coordinate with the states to ensure that any such action is consistent with, and imposes no greater restriction or regulatory requirement, than applicable state water law.

What's happening now March 22, 2018

Committee on Energy and Natural Resources. Hearings held. Hearings printed: S.Hrg. 115-511.

 Related & companion bills 6
 Bill text 1 version

Source documents hosted by congress.gov.

 Committees of jurisdiction 1
Cite this page click to expand
APA
U.S. Congress. (2026). S. 2563: Water Supply Infrastructure and Drought Resilience Act of 2018. 115th Congress. Open America. https://openamerica.io/bill/115-S-2563/
MLA
"S. 2563: Water Supply Infrastructure and Drought Resilience Act of 2018." 115th Congress, 2026, Open America, https://openamerica.io/bill/115-S-2563/.
Bluebook (legal)
S. 2563, 115th Cong. (2026), https://openamerica.io/bill/115-S-2563/.
Markdown link
[S. 2563: Water Supply Infrastructure and Drought Resilience Act of 2018](https://openamerica.io/bill/115-S-2563/)
Report a problem