HR 4998 114th Congress House Energy Administrative law and regulatory procedures Environmental assessment, monitoring, research Government information and archives Licensing and registrations Nuclear Regulatory Commission (NRC) Nuclear power Public participation and lobbying Radioactive wastes and releases State and local government operations

Nuclear Plant Decommissioning Act of 2016

Introduced: April 20, 2016 Introduced by: Welch, Peter Democratic · Vermont See on congress.gov
 Everywhere this bill has been 3 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Apr 22, 2016
Referred to the Subcommittee on Energy and Power.
Apr 20, 2016
Referred to the House Committee on Energy and Commerce.
Apr 20, 2016
Introduced in House
 Plain-English summary Congressional Research Service

Nuclear Plant Decommissioning Act of 2016

This bill amends the Atomic Energy Act of 1954 to require a Nuclear Regulatory Commission (NRC) licensee to submit to the NRC a post-shutdown decommissioning activities report (PSDAR) regarding the shutdown of a nuclear facility.

In the state where the nuclear facility is located, the NRC is required to: (1) solicit public comments on a proposed PSDAR; (2) conduct at least two public hearings; and (3) invite the state to file a statement of support, nonsupport, or conditional support for the proposed PSDAR with specific recommendations that could lead to support.

The bill prescribes the criteria for determining whether a proposed PSDAR is permissible if a host state files a statement of conditional support.

The NRC must determine the adequacy or inadequacy of a proposed PSDAR and issue a decision document accordingly.

The NRC must not approve a proposed PSDAR unless the proposed PSDAR requires compliance with applicable state law relating to air, water, soil quality, or radiological standards if the state law is more restrictive than its federal counterpart.

The NRC must notify: (1) each licensee of the opportunity to develop a revised PSDAR for any facility for which a PSDAR has been submitted but for which decontamination and dismantling activities have either not been commenced, or have been commenced for less than one year; and (2) each state within 50 miles of such facility that they have the opportunity to consult with the licensee who submitted the PSDAR.

What's happening now April 22, 2016

Referred to the Subcommittee on Energy and Power.

 Committees of jurisdiction 2