Niblack and Bokan Mountain Mining Area Roads Authorization Act
Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.
Niblack and Bokan Mountain Mining Area Roads Authorization Act - Directs the Secretary of Agriculture, acting through the Chief of the Forest Service, to establish a road corridor: (1) following 1 of the 2 routes identified as "Niblack Route 1" or "Niblack Route 2" on the map entitled "Road to Niblack Mine and Bokan Mountain Route Extension," numbered 1, and dated June 21, 2012; and (2) to the Bokan Mountain mine that branches off the Niblack Mine road corridor in order to connect the Prince of Wales Island road system in Alaska to the area of the Niblack and Bokan Mountain patented mineral claims on the southeast side of Prince of Wales Island.
Sets forth requirements for such road corridor.
Authorizes Alaska and the Prince of Wales Community Advisory Council to participate as cooperating agencies during the preparation of any environmental impact statement prepared with respect to the road corridor.
Expresses the intent of Congress that any federal permit required for such road construction be issued or denied within one year after the date of the permit application.
Read twice and referred to the Committee on Energy and Natural Resources.
- Introduced in Senate Formatted Text PDF Formatted XML
Cite this page
U.S. Congress. (2026). S. 181: Niblack and Bokan Mountain Mining Area Roads Authorization Act. 113th Congress. Open America. https://openamerica.io/bill/113-S-181/
"S. 181: Niblack and Bokan Mountain Mining Area Roads Authorization Act." 113th Congress, 2026, Open America, https://openamerica.io/bill/113-S-181/.
S. 181, 113th Cong. (2026), https://openamerica.io/bill/113-S-181/.
[S. 181: Niblack and Bokan Mountain Mining Area Roads Authorization Act](https://openamerica.io/bill/113-S-181/)