Skip to main content
HR 2417 113th Congress House Energy Administrative law and regulatory procedures Department of Energy Electric power generation and transmission Emergency planning and evacuation Energy storage, supplies, demand Federal Energy Regulatory Commission (FERC) Intelligence activities, surveillance, classified information Military facilities and property Public utilities and utility rates

SHIELD Act

Introduced: June 18, 2013 See on congress.gov
 Everywhere this bill has been 3 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Jun 21, 2013
Referred to the Subcommittee on Energy and Power.
Jun 18, 2013
Referred to the Committee on Energy and Commerce, and in addition to the Committee on the Budget, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Jun 18, 2013
Introduced in House
 Plain-English summary Congressional Research Service

Secure High-voltage Infrastructure for Electricity from Lethal Damage Act or SHIELD Act - Amends the Federal Power Act to authorize the Federal Energy Regulatory Commission (FERC), with or without notice, hearing, or report, to order emergency measures to protect the reliability of either the bulk-power system or the defense critical electric infrastructure whenever the President issues a written directive or determination identifying an imminent grid security threat.

Directs FERC to consult with governmental authorities in Canada, Mexico, and the Electric Reliability Organization (ERO) regarding implementation of emergency measures.

Prescribes: (1) implementation procedures; and (2) related cost recovery measures affecting owners, operators, and users of either the bulk-power system or the defense critical electric infrastructure.

Directs FERC to require any owner, user, or operator of the domestic bulk-power system to implement measures to protect the system against specified vulnerabilities.

Requires FERC to issue an order directing ERO to submit for approval, within 30 days, a reliability standard requiring implementation, by any owner, operator, or user of the bulk-power system in the United States, of measures to protect the bulk-power system against an identified grid security vulnerability (including a protection plan with automated hardware-based solutions).

Directs FERC also to order the ERO to submit reliability standards to: (1) protect the bulk-power system from a reasonably foreseeable geomagnetic storm event or electromagnetic pulse event (EMP); and (2) require entities that own or operate large transformers to ensure their adequate availability to restore promptly the reliable operation of the bulk-power system in the event of destruction or disability as a result of attack or a geomagnetic storm or EMP.

Directs the Secretary of Energy to establish a program to: (1) develop technical expertise in the protection of electric energy systems against either geomagnetic storms or malicious acts using electronic communications or electromagnetic weapons; and (2) share it with owners, operators, or users of systems for the generation, transmission, or distribution of electric energy located in the United States and with state commissions.


What's happening now June 21, 2013

Referred to the Subcommittee on Energy and Power.

 Committees of jurisdiction 3