HR 3680 112th Congress House Water Resources Development Administrative law and regulatory procedures Congressional oversight Dams and canals Department of Energy Electric power generation and transmission Federal Energy Regulatory Commission (FERC) Government studies and investigations Licensing and registrations Water resources funding Water use and supply

Hydropower Regulatory Efficiency Act of 2011

Introduced: December 15, 2011 See on congress.gov
 Everywhere this bill has been 6 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Jan 3, 2012
Referred to the Subcommittee on Water and Power.
Dec 20, 2011
Referred to the Subcommittee on Energy and Environment.
Dec 16, 2011
Referred to the Subcommittee on Energy and Power.
Dec 16, 2011
Referred to the Subcommittee on Highways and Transit.
Dec 15, 2011
Referred to the Committee on Energy and Commerce, and in addition to the Committees on Transportation and Infrastructure, Natural Resources, and Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Dec 15, 2011
Introduced in House
 Plain-English summary Congressional Research Service

Hydropower Regulatory Efficiency Act of 2011 - Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements.

Amends the Federal Power Act to revise the limitation on the maximum installation capacity of conduit hydroelectric facilities that are eligible for an exemption from licensing requirements.

Waives license requirements for any conduit hydroelectric facility that: (1) uses only the hydroelectric potential of a non-federally owned conduit, (2) has an installed capacity that does not exceed 5 megawatts, and (3) is not currently licensed or exempted from license requirements.

Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.

Authorizes FERC to: (1) grant an exemption from license requirements only to conduit hydroelectric facilities on non-federal land that have an installed capacity not exceeding 40 megawatts, and (2) extend the term of a preliminary permit once for up to 2 additional years if it finds that the permittee has carried out activities in good faith and with reasonable diligence.

Directs FERC to: (1) investigate the feasibility of the issuance of a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects.

Directs the Secretary of Energy (DOE) to study: (1) the potential megawatts of hydropower that may be obtained from U.S. conduits; and (2) land well-suited for pumped storage sites and located near existing or potential sites of intermittent renewable resource development, such as wind farms.

Directs the President to report to certain congressional committees on actions taken by DOE to implement the memorandum of understanding on hydropower entered into on March 24, 2010.

What's happening now January 3, 2012

Referred to the Subcommittee on Water and Power.

 Committees of jurisdiction 8