HR 829 110th Congress House Energy Administrative procedure Administrative remedies Arts, Culture, Religion Civil Rights and Liberties, Minority Issues Commemorations Cultural property Department of Energy Electric power transmission Eminent domain Energy demand Engineering Environmental Protection Environmental assessment Federal Energy Regulatory Commission Federal-state relations Government Operations and Politics Government paperwork Historic sites History

National Interest Electric Transmission Corridor Clarification Act

Introduced: February 5, 2007 See on congress.gov
 Everywhere this bill has been 4 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Feb 6, 2007
Referred to the Subcommittee on Energy and Air Quality.
Feb 5, 2007
Referred to the House Committee on Energy and Commerce.
Feb 5, 2007
Sponsor introductory remarks on measure. (CR E256-257)
Feb 5, 2007
Introduced in House
 Plain-English summary Congressional Research Service

National Interest Electric Transmission Corridor Clarification Act - Amends the Federal Power Act to revise the factors the Secretary of Energy may consider in determining whether to designate a national interest electric transmission corridor.

Authorizes the Secretary to consider whether the designation would have potential impacts on natural values and special places considered to be in the national interest. Repeals authority to consider whether designation would serve U.S. energy independence.

Directs the Secretary, before a corridor designation, to analyze all alternatives measures that could address energy transmission constraints or congestion.

Prohibits a corridor designation from encompassing, within one mile of their respective boundaries, lands on which development is prohibited or limited to protect scenic, natural, cultural, or historic resources.

Revises conditions for issuance of permits by the Federal Energy Regulatory Commission (FERC) for construction or modification of electric transmission facilities in such a corridor. Requires that a state commission or other state entity with authority to approve facility siting has: (1) disapproved the siting in a decision that FERC considers an abuse of discretion; or (2) unreasonably withheld or delayed making a decision for at least a year.

Requires each permit application to include an engineering study of the feasibility of placing the line underground.

Requires treatment as a taking for which just compensation is due of a diminution of 10% or more in any property value resulting from acquisition of a right-of-way and the construction of a facility on it.

Requires each agency to issue its own record of decision in order to ensure that its environmental review complies with statutory mandates and regulatory requirements.

Repeals any right to appeal to the President an agency denial or failure to act regarding federal authorization for a transmission facility.