Electric Reliability Act of 2004
Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.
Electric Reliability Act of 2004 - Amends the Federal Power Act to extend Federal Energy Regulatory Commission (FERC) jurisdiction over each electric reliability organization (ERO), regional entity, and user, owner, and operator of a bulk-power system for purposes of approving reliability standards and enforcing compliance with this Act.
Prescribes procedural guidelines for: (1) certification as an ERO; (2) filing of reliability standards; and (3) imposition of penalties by either an ERO or FERC for noncompliance with this Act
Requires an ERO to: (1) file with FERC for approval any proposed rule or rule change; and (2) take all appropriate steps to gain recognition in Canada and Mexico.
Requires an ERO to assess periodically the reliability and adequacy of the interconnected bulk-power system in North America.
Directs FERC to establish a regional advisory body on the petition of at least two-thirds of the States within a region that have more than half of their electric loads served within the region
Declares this Act inapplicable to Alaska or Hawaii.
Read twice and referred to the Committee on Energy and Natural Resources.
- Introduced in Senate Formatted Text PDF
Cite this page
U.S. Congress. (2026). S. 2014: Electric Reliability Act of 2004. 108th Congress. Open America. https://openamerica.io/bill/108-S-2014/
"S. 2014: Electric Reliability Act of 2004." 108th Congress, 2026, Open America, https://openamerica.io/bill/108-S-2014/.
S. 2014, 108th Cong. (2026), https://openamerica.io/bill/108-S-2014/.
[S. 2014: Electric Reliability Act of 2004](https://openamerica.io/bill/108-S-2014/)