S 1754 108th Congress Senate Energy Administrative procedure Commerce Congress Congressional reporting requirements Cost effectiveness Department of Energy Economics and Public Finance Electric power distribution Electric power production Electric power transmission Electric utilities Energy efficiency Federal Energy Regulatory Commission Federally-guaranteed loans Finance and Financial Sector Government Operations and Politics Government trust funds Governmental investigations Independent power producers

Electric Reliability Security Act of 2003

Introduced: October 17, 2003 See on congress.gov
This bill died when the 108th Congress ended
It never became law before the 108th Congress (2003–2004) adjourned, and bills don't carry over to the next Congress. It would have to be reintroduced. You can still save it for reference, but it won't receive updates.
 Everywhere this bill has been 3 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Oct 17, 2003
Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S12840-12845)
Oct 17, 2003
Sponsor introductory remarks on measure. (CR S12839-12840)
Oct 17, 2003
Introduced in Senate
 Ask about this bill AI · grounded in the bill text

Have a question about what this bill does? Ask in plain English; the answer is drawn from the bill's actual text and official record, and it'll tell you when something isn't in the text rather than guess.

AI answers can be imperfect; always confirm against the full bill text.

 Plain-English summary Congressional Research Service

Electric Reliability Security Act of 2003 - Amends the Federal Power Act (FPA) to grant the Federal Energy Regulatory Commission (FERC) jurisdiction over a domestic electric reliability organization, any regional entities, and all users, owners and operators of the bulk power system for purposes of approving reliability standards.

Directs FERC, upon petition of certain States, to establish a regional advisory body to provide advice regarding: (1) an existing or proposed regional reliability entity; and (2) proposed standards and fees.

Excludes Alaska and Hawaii from the provisions of this Act.

Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to direct the Secretary of Energy to develop a model code to ensure electric facility safety and reliability.

Amends the FPA to grant the consent of Congress to an agreement to establish a regional transmission planning agency subject to specified FERC determinations.

Establishes an Electricity Outage Investigation Board to investigate the causes of a major domestic bulk-power system failure.

Requires the Secretary to contract with the National Academy of Sciences to study and report to the President and Congress on the reliability of the U.S. electricity grid.

Directs the Secretary of Energy to establish a System Benefits Trust Fund Board which shall create the System Benefits Trust Fund to provide matching funds to States and Indian tribes for public benefits programs.

Requires electric retail suppliers to: (1) implement energy efficiency and peak load reduction programs in retail customer facilities and the distribution systems that serve them ; and (2) produce savings by specified percentages in total peak power demand and electricity use by retail customers.

Directs the Secretary to publish a final rule by a certain date to determine whether the standards in effect for central air conditioners and heat pumps should be amended.

Grants the Secretary loan guarantee authority for activities that enhance the reliability, security, efficiency and cost-effectiveness of electricity generation, transmission, or distribution.

Amends PURPA to require electric utilities to make net metering service available upon request of any electric consumer.

Amends the FPA to prescribe interconnection guidelines to distribution and transmission facilities.

Instructs the Secretary to establish a demonstration program for innovative technologies for renewable uninterruptible power supply systems located in eligible buildings (on-site generation for emergency facilities).

What's happening now October 17, 2003

Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S12840-12845)

 Bill text 1 version

Source documents hosted by congress.gov.

 Committees of jurisdiction 1
Cite this page click to expand
APA
U.S. Congress. (2026). S. 1754: Electric Reliability Security Act of 2003. 108th Congress. Open America. https://openamerica.io/bill/108-S-1754/
MLA
"S. 1754: Electric Reliability Security Act of 2003." 108th Congress, 2026, Open America, https://openamerica.io/bill/108-S-1754/.
Bluebook (legal)
S. 1754, 108th Cong. (2026), https://openamerica.io/bill/108-S-1754/.
Markdown link
[S. 1754: Electric Reliability Security Act of 2003](https://openamerica.io/bill/108-S-1754/)
Report a problem